NEEDS/WISH PROJECT
LIST
We'll be adding to this list as
projects arise. Please consider helping out in whatever
way you can. This is an open invitation to the entire
community to help out with manual labor, supplies or
professional knowledge.
- Brushing
DONE
- New Stage Area
DONE
- Installing New Fencing. We need
someone with an auger to plant our woven fencing along the
Maple street entrance and parking lot.
DONE
- Cleaning all buildings. DONE
- Painting all the outside of all wooden buildings
DONE IN PART
- Remove other beer cooler in lower
stand. DONE
- Landscaping, leveling and filling
in of various areas with fill, dirt, granite, etc.
DONE IN PART
- Masonry on entrance stone
structures. DONE
- Additional PA speakers to north
end of grounds, museum area, barns, commercial exhibit hall,
and other areas.
DONE IN PART
- Installing new permanent gas lines
in all buildings. DONE
- Fixing demo fencing and gates. DONE
- Wiring (we need to get a new 240v
line to the new stage area)
DONE
- Electrical, multiple areas...
We need to redo most of our outside lights, we need to redo
most of our outside wiring, we'd like to create a plan to
run underground, most outside wiring needs to be redone and
many buildings need overhauls.
DONE IN PART
- New signs on all stands and
buildings clearly identifying name
- Clear and prepare a picnic area on
the southwest side of the park complete with tables, grill
and water.
Please contact us at info@rosholtfair.com
for more information on helping out or get in touch with one of
our board members.
Here is an inspection report submitted to
the Fair Board and Village Board two years ago. It will
give you an idea of the many areas we want to improve.
Rosholt Fairgrounds
Building and Grounds Evaluation and Improvement Plan (ongoing)
Submitted by: Chris Stanislowski, Mike Bembenek, Todd Wierzba
and Chris Martin
September 18, 2008
Upon inspection, the following items have
been identified as areas in need of improvement. With the
exception of item 1 on 4H Exhibit Hall, no priority list has yet
been established. Priorities will be considered through
addendum items.
Note: this project is on hold as the building may be torn down to make way for a new larger demo area and tractor pulling track. 5/15/10
Rabbit Barn:
-
Fix leaking roof in two places
-
Remove leftover lean to roof
-
Reconstruct/Reinforce Center Posts and
Supports
-
Paint
Cattle Barn:
-
Paint inside
-
Add ventilation fans
-
Fix and remove outdated wiring
-
Clean and organize
-
Redo plumbing outside
-
Paint Roof
DONE
Pinkerton Building:
-
Remove milk machine and move to dairy
barn
DONE
Demo Area:
-
Secure Funding
-
Redo bleachers/seating area
-
Redo perimeter fence
-
Trim trees
-
Secure cement bumpers
DONE
-
Review/redo entrance area
-
Redo beverage serving area and possibly
add additional snack area
-
Add clay in race track area
-
Expand and fix up track DONE
-
Redo protective fencing between track
and spectators
DONE
Cheese Curd Stand:
-
Stain deck and railings
-
Fix sheet of plywood on stump
-
Replace bad deck boards
-
Redo gas piping to hard pipe DONE
-
Add shelving
-
Install holding tank or French drain for
waste water
Note: a majority of this project is on hold pending the completion of the long-range planning committee's recomendations
Lower Beer Stand:
-
Redo Roof
-
Inspect/replace pillars/center posts
-
Remove fencing and poles
DONE
-
Research removing taps and replacing
with cans for distribution of products from multiple
distributors
DONE
-
Review building as a whole and consider
replacing and redoing entire area
-
Consider extending deck
French Fry Stand:
-
Redo gas piping to hard pipe DONE
-
Replace Coke refrigerator
-
Repaint building
DONE
-
Redo lighting
Food Stand 1:
-
Redo gas piping to hard pipe
DONE
-
Paint
DONE
-
Inspect and renovate electrical (add
amps)
-
Fix leaky sink
-
Evaluate/replace lighting in kitchen
-
Replace screens
-
Clean grill burners
-
Inspect/upgrade ventilation
-
Fix drains DONE
-
Inspect shingles / roof and replace if
needed
Dinner Stand:
-
Redo cobbled up patchwork on roof
-
Pressure wash concrete
DONE
-
Install new equipment
Commercial Exhibit Hall:
-
Remove insulation
-
Redo Siding
-
Inspect wood and replace if necessary
-
Replace fan louver on South side
-
Redo electric feed DONE
-
Inspect and redo plumbing if necessary
4H Exhibit Hall
-
Remove Ceiling, inspect, paint if
necessary
DONE
-
Restore Windows Lower and Upper
DONE
-
Replace broken boards
DONE
-
Paint outside
DONE
General Landscaping:
-
Remove stumps
DONE
-
Fill in ruts
DONE
-
Level out various areas
DONE
-
Inspect/replace outdated wiring
DONE IN PART
-
Add lighting
DONE IN PART
-
Increase signage
-
Utilize a forester to review all trees
and remove those that are hazardous or unbeneficial to the
conservation of the grounds.
DONE IN PART
-
Remove all dead limbs
DONE IN PART
Addendum Items (not necessarily property
related):
-
Establish a long range plan
-
Establish a property improvement plan
-
Establish a conservation plan
-
Establish a marketing plan
DONE IN PART
-
Establish annual budget
-
Establish community work days
DONE IN PART
-
Establish opening and closing procedures
-
Establish staff training procedures
-
Establish rental procedures
-
Establish a “Friends of the Fair”
committee to evaluate and offer suggestions in an ongoing
basis consisting of member of the community, Fair Board and
Village Board.
-
Establish written emergency procedures
for severe weather, fire, lost child and other emergencies
DONE
|